< img height="1" width="1" style="display:none;" alt="" src="https://dc.ads.linkedin.com/collect/?pid=534131&fmt=gif" />


Email:info@amisfelting.com
Skype: felt.belt
Office address:  Majialong Industrial Zone,  Shenzhen, Guangdong, P.R.China
Visit us on social application: Facebook Google+  Twitter  Linkedin  Instagram

News
当前位置:首页 > News
  • 作者:
  • 来源:
  • 日期: 2019-04-08
  • 浏览次数: 1256
Industrial ironing machine 7 maintenance tips Industrial ironing machine 7 maintenance tips


1. If the industrial ironing machine is not used for a long time, the belt should be removed to prevent the belt from being polluted by dust;


2. After the industrial ironing machine stops every day, the ironing machine will be loosened to extend the service life of the fray belt and various parts;

3. After using the industrial ironing machine for a period of time, it is necessary to regularly inject lubricating oil and grease into each rotating part;

4. The industrial ironing machine safety valve should be inspected regularly to ensure that the safety valve automatically deflate when the steam pressure exceeds 0.6MPa, which plays a safety protection role;
 5. When the industrial ironing machine supplies steam, when the steam reaches the specified pressure, open the bypass valve on the circuit pipe, discharge the condensed water into the sewage pipe until the steam flows out, and then close the valve.

6. During the working process of the industrial ironing machine, always pay attention to observe whether there is steam leakage in the rotary joint, and replace the graphite ring and the sealing ring. Usually, when the graphite ring is just replaced, there will be a small amount of leakage of steam, but after the ironing machine has been working for a period of time, the graphite ring is ground and the steam leakage will disappear automatically. If the steam leak still exists, the swivel should be replaced.

Friendly reminder: [Industrial ironing machine should be shut down after normal use for half a year, replace the oil in the reducer, and add grease to each bearing separately. It should be inspected once after one year of use. When checking the drainage system, be sure to install the siphon tube perpendicular to the horizontal plane.

If need Ironer Padding,belt please contact us info@amisfelting.com
Copyright © Amisfelting  URL:www.amisfelting.com
本站部分图文来源网络,如有侵权问题请通知我们处理!